Iowa Power Company
Goal
Inspect and repair 16 valves in less than 72 hours
Results
- Disassembled all valves, confirmed measurements
- Inspected wedge, disc, plug, and seat conditions for repair or resurfacing
- Repaired 11 pressure seal valves, 3 bolted bonnet valves, and 2 welded-in safety valves in 43 hours, a full 29 hours faster than the needed downtime
Colorado Power Company
Goal
Inspect and repair 39 valves on time and under budget
Results
- Performed walk down and planned the manpower and equipment necessary to complete the job
- Setup full machining, welding, and testing equipment on-site
- Staffed the entire plant project with necessary personnel
- Repaired 39 valves under budget and ahead of schedule